• +90 312 212 0 222
    |
  • info@gungorelektrik.com
    • HISTORY
    • |
    • CAREER

    Güngör Elektrik

    35
    YEARS
    • HOMEPAGE
    • ORGANIZATIONAL
      • HISTORY
      • MISSION & VISION
      • POLICIES
        • QUALITY POLICY
        • HSE POLICY
        • ENVIRONMENT POLICY
      • CERTIFICATES
      • AFFILIATIONS
      • CATALOGUE
    • MAIN ACTIVITIES
      • CONNECTION OF GENERATION PLANTS TO THE GRID
        • RENEWABLE ENERGY
          • WIND POWER PLANT
          • GEOTHERMAL POWER PLANT
          • HYDROLIC POWER PLANT
          • SOLAR ENERGY POWER PLANTS
        • THERMAL POWER PLANTS
          • NATURAL GAS COMBINED CYCLE and COAL POWER PLANTS
      • CONNECTION OF CONSUMER PLANTS TO THE TRANSMISSION SYSTEM
        • INDUSTRIAL PLANTS and ORGANIZED INDUSTRIAL ZONS
      • TEİAŞ TRANSMISSION SYSTEM CONSTRUCTION WORKS
        • AIS & GIS TRANSFORMER SUBSTATIONS
        • OVER HEAD LINES
      • OPERATION and MAINTENANCE SERVICES
      • PROJECT DESIGNING, ENGINEERING and CONSULTANCE SERVICES
      • ELECTRICAL ENERGY DISTRIBUTION SYSTEMS CONSTRUCTION WORKS
    • REFERENCES
      • ONGOING PROJECTS
      • COMPLETED PROJECTS
    • FINANCIAL INFORMATION
    • MEDIA
      • CATALOGUE
    • CONTACT US
    • HR
      • APPLICATION FORM
      • OPEN POSITIONS
    • Türkçe

    BANDIRMA WPP (90 MW)

    Wednesday, 01 July 2009 by Güngör Elektrik

    154kV Transformer Substation, Oppposite Substation Line Feeder and MV WPP Electrical Construction Works:

    Description of supplied services by our Company under this contract:
    *Design and engineering
    *Electrical and civil projects

    Civil Works: All required civil works for SS, MV cable trenches and OHL

    Electrical Works: 154/34,5 kV BANDIRMA WPP Substation, 154 kV 46 km 1272 MCM conductor Transmission Line, WPP MV Electric Distribution (Power Distribution Line and Cable),
    *Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
    *test and commissioning ( except turbines )

    Read more
    No Comments

    BERGAMA DÜZOVA WPP (15 MW)

    Wednesday, 01 July 2009 by Güngör Elektrik

    154kV Transformer Substation, Opposite Substation Line Feeder, Power Transmission Line and MV WPP Electrical Construction Works:

    Description of supplied services by our Company under this contract:
    *Design and engineering
    *Electrical and civil projects

    Civil Works: All required civil works for SS and MV cable trenches

    Electrical Works: 154/34,5 kV BERGAMA WPP Substation, WPP MV Electric Distribution (Power Distribution Line and Cable),
    *Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
    *test and commissioning ( except turbines )

    Read more
    No Comments

    YUNTDAĞ WPP (57,5 MW)

    Saturday, 01 December 2007 by Güngör Elektrik

    154kV Transformer Substation, Opposite Substation Line Feeder, Power Transmission Line and MV WPP Electrical Construction Works:

    Description of supplied services by our Company under this contract:
    *Design and engineering
    *Electrical and civil projects

    Civil Works: All required civil works for SS, MV cable trenches and OHL

    Electrical Works: 154/34,5 kV YUNTDAĞ WPP Substation, 154 kV 26 km 3×795 MCM conductor Transmission Line, WPP MV Electric Distribution (Power Distribution Line and Cable),
    *Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
    *test and commissioning ( except turbines )

    Read more