• +90 312 212 0 222
    |
  • info@gungorelektrik.com
    • HISTORY
    • |
    • CAREER

    Güngör Elektrik

    35
    YEARS
    • HOMEPAGE
    • ORGANIZATIONAL
      • HISTORY
      • MISSION & VISION
      • POLICIES
        • QUALITY POLICY
        • HSE POLICY
        • ENVIRONMENT POLICY
      • CERTIFICATES
      • AFFILIATIONS
      • CATALOGUE
    • MAIN ACTIVITIES
      • CONNECTION OF GENERATION PLANTS TO THE GRID
        • RENEWABLE ENERGY
          • WIND POWER PLANT
          • GEOTHERMAL POWER PLANT
          • HYDROLIC POWER PLANT
          • SOLAR ENERGY POWER PLANTS
        • THERMAL POWER PLANTS
          • NATURAL GAS COMBINED CYCLE and COAL POWER PLANTS
      • CONNECTION OF CONSUMER PLANTS TO THE TRANSMISSION SYSTEM
        • INDUSTRIAL PLANTS and ORGANIZED INDUSTRIAL ZONS
      • TEİAŞ TRANSMISSION SYSTEM CONSTRUCTION WORKS
        • AIS & GIS TRANSFORMER SUBSTATIONS
        • OVER HEAD LINES
      • OPERATION and MAINTENANCE SERVICES
      • PROJECT DESIGNING, ENGINEERING and CONSULTANCE SERVICES
      • ELECTRICAL ENERGY DISTRIBUTION SYSTEMS CONSTRUCTION WORKS
    • REFERENCES
      • ONGOING PROJECTS
      • COMPLETED PROJECTS
    • FINANCIAL INFORMATION
    • MEDIA
      • CATALOGUE
    • CONTACT US
    • HR
      • APPLICATION FORM
      • OPEN POSITIONS
    • Türkçe

    GERES WPP (27,5 MW)

    Sunday, 01 December 2013 by Güngör Elektrik

    154kV Transformer Substation, Power Transmission Line and MV WPP Electrical Construction Works:

    Description of supplied services by our Company under this contract:
    *Design and engineering
    *Electrical and civil projects

    Civil Works: All required civil works for SS, MV cable trenches and OHL

    Electrical Works: 154kV 6,5km 2×1272 MCM Conductor Transmission Line and 154/34,5 kV GERES WPP Substation, WPP MV Electric Distribution (Power Distribution Line and Cable),
    *Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
    *test and commissioning ( except turbines )

    Read more
    No Comments

    SİLİVRİ WPP (45 MW)

    Sunday, 01 December 2013 by Güngör Elektrik

    154kV Transformer Substation, Power Transmission Line+ Opposite Substation Line Feeder and MV WPP Electrical Construction Works:

    Description of supplied services by our Company under this contract:
    *Design and engineering
    *Electrical and civil projects

    Civil Works: All required civil works for SS, MV cable trenches and OHL

    Electrical Works: 154/34,5 kV SİLİVRİ WPP Substation,154 kV Line Feeder construction at opposite TEİAŞ SS, WPP MV Electric Distribution (Power Distribution Line and Cable),
    *Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
    *test and commissioning ( except turbines )

    Read more
    No Comments

    SİNCİK WPP (25 MW)

    Monday, 01 July 2013 by Güngör Elektrik

    154kV Transformer Substation, Power Transmission Line+ Opposite Substation Line Feeder and MV WPP Electrical Construction Works:

    Description of supplied services by our Company under this contract:
    *Design and engineering
    *Electrical and civil projects

    Civil Works: All required civil works for SS, MV cable trenches and OHL

    Electrical Works: 154/34,5 kV SİNCİK WPP Substation, Transmission Line+ 154 kV Line Feeder construction at opposite TEİAŞ SS, WPP MV Electric Distribution (Power Distribution Line and Cable), *Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines) *test and commissioning ( except turbines )

    Read more
    No Comments

    HASANBEYLİ WPP (50 MW)

    Saturday, 01 June 2013 by Güngör Elektrik

    154kV Transformer Substation and MV WPP Electrical Materials Supply:

    Description of supplied services by our Company under this contract:
    *Supply and delivery of electrical, electromechanical equipment/material (except turbines) of 154/34,5kV Wind Power Plant Transformer Substation, 154 kV and WPP MV Electric Distribution (Power Distribution Line and Cable)

    Read more
    No Comments

    METRİSTEPE WPP (45 MW)

    Thursday, 01 December 2011 by Güngör Elektrik

    154kV Transformer Substation, Power Transmission Line and MV WPP Electrical Construction Works:

    Description of supplied services by our Company under this contract:
    *Design and engineering
    *Electrical and civil project

    Civil Works: All required civil works for SS, MV cable trenches and OHL

    Electrical Works: 154/34,5 kV METRİSTEPE WPP Substation, 154 kV 9,47 km 1272 MCM conductor Transmission Line, WPP MV Electric Distribution (Power Distribution Line and Cable),
    *Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
    *test and commissioning ( except turbines )

    Read more
    No Comments

    KİLLİK WPP (40 MW)

    Thursday, 01 December 2011 by Güngör Elektrik

    154kV Transformer Substation and MV WPP Electrical Construction Works:

    Description of supplied services by our Company under this contract:
    *Design and engineering
    *Electrical and civil projects

    Civil Works: All required civil works for SS and MV cable trenches

    Electrical Works: 154/34,5 kV KİLLİK WPP Substation, WPP MV Electric Distribution (Power Distribution Line and Cable),
    *Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
    *test and commissioning ( except turbines )

    Read more
    No Comments

    KAYADÜZÜ WPP (40 MW)

    Saturday, 01 October 2011 by Güngör Elektrik

    154kV Transformer Substation and MV WPP Electrical Construction Works:

    Description of supplied services by our Company under this contract:
    *Design and engineering
    *Electrical and civil projects

    Civil Works: All required civil works for SS and MV cable trenches

    Electrical Works: 154/34,5 kV KAYADÜZÜ WPP Substation, WPP MV Electric Distribution (Power Distribution Line and Cable),
    *Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
    *test and commissioning ( except turbines )

    Read more
    No Comments

    AKRES WPP (45 MW)

    Wednesday, 01 June 2011 by Güngör Elektrik

    154kV Transformer Substation and MV WPP Electrical Construction Works :

    Description of supplied services by our Company under this contract:
    *Design and engineering
    *Electrical and civil projects

    Civil Works: All required civil works for SS and MV cable trenches

    Electrical Works: 154/34,5 kV AKRES WPP Substation, WPP MV Electric Distribution (Power Distribution Line and Cable),
    *Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
    *test and commissioning ( except turbines )

    Read more
    No Comments

    ALİAĞA WPP (90 MW)

    Monday, 01 February 2010 by Güngör Elektrik

    154kV Transformer Substation, Oppposite Substation Line Feeder and MV WPP Electrical Construction Works :

    Description of supplied services by our Company under this contract:
    *Design and engineering
    *Electrical and civil projects

    Civil Works: all required civil works for SS and MV cable trenches

    Electrical Works: 154/34,5 kV ALİAĞA WPP Substation, WPP MV Electric Distribution (Power Distribution Line and Cable) and 154 kV Line Feeder construction at opposite TEİAŞ SS
    *Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
    *test and commissioning ( except turbines )

    Read more
    No Comments

    KOCADAĞ WPP (15 MW)

    Saturday, 01 August 2009 by Güngör Elektrik

    154kV Transformer Substation and MV WPP Electrical Construction Works:

    Description of supplied services by our Company under this contract:
    *Design and engineering
    *Electrical and civil projects

    Civil Works: All required civil works for SS and MV cable trenches

    Electrical Works: 154/34,5 kV KOCADAĞ WPP Substation, WPP MV Electric Distribution (Power Distribution Line and Cable) and 154 kV Line Feeder construction at opposite TEİAŞ SS
    *Supply, delivery, installation of electrical, electromechanical equipment/material (except turbines)
    *test and commissioning ( except turbines )